Gradinlift livre avec succès un pont levant vertical pour la base industrielle de Zhongwei Indonesia North Morowali

At Gradinlift, we take immense pride in providing cutting-edge material handling solutions that meet the most demanding industrial requirements. Recently, we successfully delivered a state-of-the-art Vertical Lift Bridge to the Zhongwei Indonesia North Morowali Industrial Base, designed specifically for ore transportation.

Project Overview

Le Vertical Lift Bridge is an essential component for ore handling operations, enhancing the safety, efficiency, and convenience of material transportation within the industrial base. Designed with precision and durability in mind, this hydraulic lift system is capable of supporting the most rigorous transportation tasks, allowing the seamless movement of ores between various stages of the process.

Advanced Technology for Enhanced Performance

Our solution consists of four hydraulic lift bridges, including three platforms measuring 4.8m × 10m and one platform measuring 4.8m × 16m. Each platform can bear a load of up to 36 tons and achieve a lifting height of 4.2 meters, ideal for heavy-duty truck and ore transportation.

The system is equipped with hydraulic power stations located at both ends of the bridge, ensuring optimal performance and reliability in lifting and lowering. Designed to meet the specific needs of this industrial application, the system combines power with flexibility for smooth, continuous operation.

Key Features of the Vertical Lift Bridge:

  1. Capacité de charge élevée
    With the ability to support up to 36 tons per platform, the lift bridge is perfect for transporting heavy-duty trucks and large volumes of ore, providing the necessary stability and strength for mining operations.
  2. Flexible Control Options
    The system is easily controlled via manual and remote control options, allowing operators to respond quickly to transportation needs with ease and efficiency. This flexibility ensures smooth integration into existing workflows.
  3. Intelligent Control System
    Equipped with linear encoders, proportional valves, and a PLC system, the system guarantees precise height control and synchronized lifting, minimizing the risk of operational errors and improving overall system accuracy.
  4. Safety-First Design
    To prioritize safety, the lift bridge is designed to remain elevated when not in use, avoiding collisions with passing transport vehicles beneath the bridge. This design minimizes the risk of accidents and ensures a safe working environment.
  5. Durable, Long-Lasting Structure
    The lift bridge’s 4-cylinder, 8-column structure provides exceptional stability and durability, withstanding the harsh conditions often found in mining environments. Built to last, it can perform reliably even under the most challenging conditions.

Project Impact

The successful installation of the Vertical Lift Bridge system at the Zhongwei Indonesia North Morowali Industrial Base is a testament to Gradinlift’s commitment to delivering reliable and efficient solutions for industrial applications. This system is designed to improve the efficiency of ore handling, streamline operations, and reduce the risks associated with material transportation.

At Gradinlift, we understand the challenges that come with complex industrial operations, and we are proud to provide our customers with innovative, durable, and safe solutions that make a difference in their day-to-day operations.

Discover how Gradinlift can enhance your operations with our advanced vertical lift systems—designed to meet the demands of your most critical transportation needs.

For more information, please nous contacter.

VOUS NE SAVEZ TOUJOURS PAS QUOI FAIRE ?

Nous sommes heureux que vous ayez choisi de nous contacter. Veuillez remplir notre formulaire et l'un des membres de notre équipe vous recontactera.

    X